Document Library:

Materials produced for the EIS process, public meetings, and other resources will be posted here as they are finalized.

 

The purpose of an EIS is to conduct
an assessment of probable, significant and adverse impacts from the proposal and possible mitigation measures.

  • Health Impact Assessment

    What is a Health Impact Assessment (HIA)

    An HIA is defined as a combination of procedures, methods and tools that systematically judges the potential, and sometimes unintended, effects of a proposed program, project, plan, or policy on the health of a population and the distribution of those effects within the population.

    Learn More

  • SEPA Final EIS

    SEPA Environmental Impact Statement

    SEPA requires agencies to take environmental factors into consideration before taking action on proposed projects. It’s important to emphasize that the environmental review process is not a decision, permit, or a yes or no on the project.

    Download the SEPA EIS

  • Proposed Action

    Millennium Bulk Terminals – Longview (MBTL) LLC, based in Longview, Washington proposes to construct and operate a coal export terminal at the site of the former Reynolds Aluminum smelter in Cowlitz County. The MBTL proposal is for a facility that would ultimately have the capacity to handle 44 million metric tons of coal annually.

    Learn More

MILLENNIUM Bulk Terminals-Longview | NEPA / SEPA Environmental Impact Statements

©2013 Millennium Bulk Terminals-Longview, WA EIS  |   en Español  |  Request Special Services  |  Mailing Address | Privacy Policy