Submission Number: MBTL-EIS-0000773 

Received: 10/5/2013 12:19:00 PM
Commenter: Phylis Rossi
Organization: 
State: New Jersey

Agency: Cowlitz County, the Washington Department of Ecology, and the U.S. Army Corps of Engineers
Initiative: Millennium Bulk-Terminals Longview EIS
Attachments: No Attachments
Submission Text
From:Phylis Rossi <phylisr@hotmail.com> Sent:Saturday, October 05, 2013 12:19 PM To:comments@millenniumbulkeiswa.gov Subject:Please Stop the Millennium Longview Coal Export Terminal
Oct 5, 2013
U.S. Corps of Engineers
Dear of Engineers,
I oppose the construction of a coal export terminal in Longview, Washington, which would transport coal on trains and ships through the Pacific Northwest.
The proposed terminal would have significant negative impacts throughout the Columbia River basin from coal dust, diesel pollution, and vessel traffic, degrading area freshwater and marine habitat, and imperiling the health of the area ecology. The directly resulting increase in coal pollution would significantly worsen climate change, ocean acidification, mercury pollution, and threaten the survival of our critically endangered salmon runs and our resident orca population.
I urge you to consider these impacts in the scope of the Environmental Impact Statement.
In addition, I request that you stop all proposed coal export terminals in the Pacific Northwest. Thank you.
Sincerely,
Phylis Rossi 115 7th St Harrison, NJ 07029-2001