Submission Number: MBTL-EIS-0000337 

Received: 9/21/2013 11:45:00 AM
Commenter: Darrell Wold
Organization: 
State: 

Agency: Cowlitz County, the Washington Department of Ecology, and the U.S. Army Corps of Engineers
Initiative: Millennium Bulk-Terminals Longview EIS
Attachments: No Attachments
Submission Text
From:darrell-wold@hotmail.com Sent:Saturday, September 21, 2013 11:45 AM To:comments@millenniumbulkeiswa.gov Subject:Longview Port

It is with great concern for the environment that I write to ask your support of the Millennium Bulk Terminals proposed Longview coal export project. The pains that have been taken to strike a balance between environmental and economic concerns is impressive. This project is an example of how ports should be developed and I would like to see it move forward without delay.

The scoping decision should limit the analysis of impacts in the EIS to those impacts that have a close connection to the project. Impacts that have a superseding cause to an impact can be identified, but should not be studied to the same degree as impacts that are proximately caused by the project. For instance, because the proposal is a terminal proposal, the use of the bulk commodity by a third party is a superseding and intervening cause to the combustion of coal. As a result of these superseding causes, the construction and operation of the terminal is not a proximate cause of the combustion of coal. If a close causal relationship cannot be established for emissions, the impacts should only be accounted for as part of the No Action Alternative as an impact that would have occurred without the project and studied nonetheless in the cumulative impact section of the EIS as a non-project impact, if studied at all.

This is an important project that will provide a vital role in boosting the economy and one that should be allowed to proceed in as quick of a manner as possible.

Sincerely Darrell Wold darrell-wold@hotmail.com